GAJANANNAIK

WEEK 6 COURSERA FINANCIAL ENGINEERING AND RISK MANAGEMENT

Assume b=0.05 is a constant for all i in the BDT model as we assumed in the video lectures. Calibrate the a_i parameters so that the model term-structure matches the market term-structure. Be sure that the final error returned by Solver is at most 10^{-8}. (This can be achieved by rerunning Solver multiple times if necessary, starting each time with the solution from the previous call to Solver.

Once your model has been calibrated, compute the price of a payer swaption with notional $1M that expires at time t=3 with an option strike of 0. You may assume the underlying swap has a fixed rate of 3.9\% and that if the option is exercised then cash-flows take place at times t=4, \ldots , 10. (The cash-flow at time t=i is based on the short-rate that prevailed in the previous period, i.e. the payments of the underlying swap are made in arrears.)

Submission Guideline: Give your answer rounded to the nearest integer. For example, if you compute the answer to be 10,456.67, submit 10457.

Question Attachments

1 attachments —

  • img
    1663455_1_41-qns-financial-engineering-and-risk-management-(3).doc
Pending
Engineering Assignment Help / Mechanical Engineering Assignment Help
08 Jul 2021
Due Date: 09 Jul 2021

Report As Dispute

Share Your Feedback

Give Review : A+ A B C D F