MAT540/MAT 540 WEEK 7 QUIZ VERSION 3

MAT 540
WEEK 7
 
Surplus variables are only associated with minimization problems. 
Answer 



 
A feasible solution violates at least one of the constraints. 
Answer 



 
A linear programming model consists of only decision variables and constraints. 
Answer 



 
Graphical solutions to linear programming problems have an infinite number of possible objective function lines. 
Answer 



 
If the objective function is parallel to a constraint, the constraint is infeasible. 
Answer 



 
A linear programming problem may have more than one set of solutions. 
Answer 



 
In minimization LP problems the feasible region is always below the resource constraints. 
Answer 



 
The following is a graph of a linear programming problem. The feasible solution space is shaded, and the optimal solution is at the point labeled Z*.  This linear programming problem is a:
Answer 



 
The following is a graph of a linear programming problem. The feasible solution space is shaded, and the optimal solution is at the point labeled Z*.  The equation for constraint DH is:
Answer 



 
The following is a graph of a linear programming problem. The feasible solution space is shaded, and the optimal solution is at the point labeled Z*.  Which of the following constraints has a surplus greater than 0?
Answer 



 
Which of the following statements is not true?
Answer 



 
Decision variables
Answer



 
The production manager for the Coory soft drink company is considering the production of 2 kinds of soft drinks: regular (R) and diet(D). Two of the limited resources are production time (8 hours = 480 minutes per day) and syrup limited to 675 gallons per day. To produce a regular case requires 2 minutes and 5 gallons of syrup, while a diet case needs 4 minutes and 3 gallons of syrup. Profits for regular soft drink are $3.00 per case and profits for diet soft drink are $2.00 per case. What is the time constraint?
Answer 



 
The production manager for the Coory soft drink company is considering the production of 2 kinds of soft drinks: regular (R) and diet (D). Two of her limited resources are production time (8 hours = 480 minutes per day) and syrup (1 of her ingredients) limited to 675 gallons per day. To produce a regular case requires 2 minutes and 5 gallons of syrup, while a diet case needs 4 minutes and 3 gallons of syrup. Profits for regular soft drink are $3.00 per case and profits for diet soft drink are $2.00 per case. What is the objective function?
Answer



 
The production manager for the Coory soft drink company is considering the production of 2 kinds of soft drinks: regular and diet. Two of her limited resources are production time (8 hours = 480 minutes per day) and syrup (1 of her ingredients) limited to 675 gallons per day. To produce a regular case requires 2 minutes and 5 gallons of syrup, while a diet case needs 4 minutes and 3 gallons of syrup. Profits for regular soft drink are $3.00 per case and profits for diet soft drink are $2.00 per case. For the production combination of 135 cases of regular and 0 cases of diet soft drink, which resources will not be completely used?
Answer 



 
Cully furniture buys 2 products for resale: big shelves (B) and medium shelves (M). Each big shelf costs $500 and requires 100 cubic feet of storage space, and each medium shelf costs $300 and requires 90 cubic feet of storage space. The company has $75000 to invest in shelves this week, and the warehouse has 18000 cubic feet available for storage. Profit for each big shelf is $300 and for each medium shelf is $150. What is the objective function?
Answer 



 
Cully furniture buys 2 products for resale: big shelves (B) and medium shelves (M). Each big shelf costs $500 and requires 100 cubic feet of storage space, and each medium shelf costs $300 and requires 90 cubic feet of storage space. The company has $75000 to invest in shelves this week, and the warehouse has 18000 cubic feet available for storage. Profit for each big shelf is $300 and for each medium shelf is $150. What is the storage space constraint?
Answer 



 
A graphical representation of a linear program is shown below. The shaded area represents the feasible region, and the dashed line in the middle is the slope of the objective function.  What would be the new slope of the objective function if multiple optimal solutions occurred along line segment AB? Write your answer in decimal notation. 
Answer 



 
Solve the following graphicallyMax z = 3x1 +4x2 s.t. x1 + 2x2 ≤ 16 2x1 + 3x2 ≤ 18 x1 ≥ 2 x2 ≤ 10 x1, x2 ≥ 0Find the optimal solution. What is the value of the objective function at the optimal solution? Note: The answer will be an integer. Please give your answer as an integer without any decimal point. For example, 25.0 (twenty five) would be written 25 
Answer 



 
Consider the following minimization problem: Min z = x1 + 2x2 s.t. x1 + x2 ≥ 300 2x1 + x2 ≥ 400 2x1 + 5x2 ≤ 750 x1, x2 ≥ 0 Find the optimal solution. What is the value of the objective function at the optimal solution? Note: The answer will be an integer. Please give your answer as an integer without any decimal point. For example, 25.0 (twenty five) would be written 25
Answer 



Answered
Other / Other
16 Dec 2015

Answers (1)

  1. Vikas

    MAT540/MAT 540 WEEK 7 QUIZ VERSION 3

    Consider the following minimization problem: Min z = x1 + 2x2 s.t. x1 + x2 ≥ 30 ****** ******