W3:
Discussion
Subscribe
Select one of the
questions below. Provide the calculation and analyze the exercise from both
concept and problem-solving perspectives. Support your thoughts with at least
one external reference (not your book).
1. The Critical Path: Why is it important to identify the
critical path before starting a project? On what kind of projects would the
critical path be irrelevant?
Concurrent Engineering (Fast Tracking): What are the
disadvantages of concurrent engineering (fast tracking)? What kinds of
projects should avoid using concurrent engineering?
2. How are the work breakdown structure and change
control connected? What are the likely outcomes if a change control
process is not used? Why? What are the major differences between managing
negative risks and managing positive risks (opportunities)?