Question 1
(TCO 3) Which of the following is not generally found in JIT environments?
· Push systems
· Low amounts of waste in the form of time and production waste
· Very small amount of variability
· Low inventory stockpiles
Question 2
(TCO 3) In JIT partnerships, suppliers have several concerns. Which of the following are concerns?
· Diversification
· Poor customer scheduling
· Small lot sizes
· All of the above
Question 3
(TCO 3) Reduction of JIT in-transit inventory can be encouraged through the use of
· choice of plant.
· low setup costs.
· close proximity of supplier to plant.
· trains, not trucks.
Question 4
(TCO 3) Just-in-time systems make demands on layouts, except
· distance reduction.
· decreased flexibility.
· reduced space and inventory.
· All of the above
Question 5
(TCO 3) Level schedules
· require that schedules be met with variation.
· process many small batches rather than one large one.
· are known as kidney bean scheduling.
· All of the above
Question 6
(TCO 3) Which of the following is specifically characterized by continuous and forced problem solving through a focus on throughput and reduced inventory?
· Just-in-time (JIT)
· Toyota Production System (TPS)
· Lean operations
· Material requirements planning (MRP)
· Kanban
Question 7
(TCO 3) Which of the following statements regarding a pull system is true?
· Large lots are pulled from upstream stations.
· Work is pulled to the downstream stations before it is actually needed.
· Manufacturing cycle time is increased.
· Problems become more obvious.
Question 8
(TCO 3) What is the time required to move orders through the production process from receipt to delivery?
· Throughput
· Manufacturing cycle time
· Pull time
· Push time
· Queuing time
Question 9
(TCO 3) Throughput measures the time
· that it takes to process one unit at a station.
· between the arrival of raw materials and the shipping of finished products.
· to produce one whole product through an empty system (i.e., with no waiting).
· required to move orders through the production process, from receipt to delivery.
· None of the above
Question 10
(TCO 3) Concerning relationships with suppliers, which of the following combinations is critical to the success of JIT?
· Close relationships with trust
· Close relationships with skepticism
· Distant relationships with trust
· Distant relationships with skepticism