Module Three Homework
To receive full credit, the problems and answers need to
professionally presented and documented. Also, be sure to show your math
or QM for Managers screen shots as single answers to these questions will
receive a very low grade.
#1 In a job shop, effective capacity is only 50 percent of
design capacity, and actual output is 80 percent of effective capacity. What
design capacity would be needed to achieve an actual output of eight jobs per
week?
#2 The manager of a car wash must decide whether to have
one or two wash lines. One line will mean a fixed cost of $6,000 a month, and
two lines will mean a fixed cost of $10,500 a month. Each line would be able to
process 15 cars an hour. Variable costs will be $3 per car, and revenue will be
$5.95 per car. The manager projects an average demand of between 14 and 18 cars
an hour. Would you recommend one or two lines? The car wash is open 300 hours a
month.
#3 Answer the following questions
Fixed
Costs:
$14,000 per year
Variable
Costs: $1.00
per unit
Revenue:
$1.55 per unit
Design
Capacity:
43,000 units per year
Effective
Capacity:
40,000 units per year
Anticipated
Output:
34,000 units per year
a. What is the break-even quantity (produced and sold)?
b. What are total revenues for the break-even quantity?
c. What are total costs for the break-even quantity?
d. What quantity would be required for a profit of $2,000?
e. What profit (loss) would there be for a quantity of 27,000?
f. What profit (loss) would there be for a quantity of
10,000?
g. What is the anticipated utilization?
h. What is the anticipated efficiency?
#4 Develop a capacity
analysis for your organization, or one you have worked with in the past.
Be sure to include in your analysis some of the following:
Design capacity
Effective capacity
Actual output
Human considerations
Operational factors
External forces
Supply chain issues
Lastly, conclude with a set of recommendations to improve
operations. These recommendations should resonate from your analysis.
If you do not have hard numbers for this analysis, feel
free to create them.