Project Management Assignment Help
Group Project Assignment
Hints
1.
Discuss among your team of each of your skills. You may use a table to record the skills. These are more like the soft skills for executing the following tasks like develop project plan; resources
planning, drawings and writing specifications; produce cost plan; safety
statement etc. These are mainly the project planning skills on this assignment.
2.
Write down the roles
and responsibilities of each other. This can be a team lead; a cost planner, a programmer, a
contract administrator. For each
role, write 4 to 6 duties and give some examples if needed.
(M1) talk about allocating the different roles in a
typical project team. For examples, you may need a project lead, a cost
planner, a time programmer, a health and safety officer or an engineer etc.
(D1). Justify why the allocation result of the roles
and responsibilities. Justify who is doing what. Accept some people may want to
do some wanted roles but the project needs the roles to be done by other people
and not necessary match everyone wants. Of course, you shall pick the expert to
do the best job suitable for him or her.
3.
Use project
management software like Microsoft
project or Power project etc to
make a timed bar chart for all
activities to be done here. This is for later
use to insert the resources.
4.
Input the labour man days and any
plant or tools onto the timed bar charts that this project needs to do for each activity. It
is better to be done by a member of
your team who knows how to do this.
(M2) Look at the project plan and show the milestone
dates and any possible risks. For example, milestone dates are dates that are
important and critical. Like start and finish dates, In this case, please
remember your activities are mainly the activity no. 1 to 9 or plus the Ms and
Ds tasks.
5.
One of your team
members need to produce the drawings and the project specifications. Drawings
should be using A4 or A3. Better to use AutoCAD’s
and the specifications should use the normal specification for a project. See
notes or web page.
6.
Use the project
management software to make out a cost plan or create a cash flow analysis
giving the project spending and the dates of spending. For some advanced students,
you can use the cost curve additionally to your cost plan with time and cash flow situations.
7.
Write out the health
and safety statement or safety plan or
policy. Giving safety guidelines and health guidelines. Make references to other statement that you have seen before but not copying
directly.
(M3) Evaluate the means with the BIM that can give better
efficiency in providing the tender documentation. This is because the BIM can
allow you to see better inside the building so that you can give better insight when writing the contract document like quantities or hidden details that you might missed if you do not use the BIM.
(D2) Critically valuate the relationships between
project planning and tender documentation. The project planning can be done
with the tender documentation indicating t constraints. But they are
interacting. Highlighting different means which tender information responds to
project planning. Here the project planning is the front end planning. The
tender information will need to spell out the planning work required.
LO4
8.
Take continual review
of the project team members
own Work, recording this throughout the project. Keep a dairy
of the work in progress. Take pictures
if needed.
9.
Evaluate their own working
practices in relationship to that of other members
of your team and compare or state the
good and not so good things. Identifying
areas of good practices for lessons
learned. .
(M4) Evaluate their own personality in relationship to your working
practices. That can be someone if fast and
someone is caring details. Some
may be following up actions
and some may be always
looking for the future. Some can be tactical and some may be strategic.
(D3) Evaluate the success of a project by thinking
individual and group practices and compare to their assigned roles and
personality. You can use a table to make it more easily to be read.