Unit 5 Project

Instructions
As a continuation of our course project due in Unit VIII  (a proposal for an   industrial and hazardous waste treatment facility), complete  the next (fifth)   section (biological and secondary treatment) of your proposal  by following the   instructions carefully, and then submit your continued draft of  your proposal   into Blackboard for grading. 
Instructions: 

    Closely read the Required Reading   assignment from Bahadori (2014)        and the Unit Lesson within the Study   Guide. 
 Open your proposal draft from Unit III   and make any improvements to        your draft using your professor’s feedback from   the Unit III project        assignment. 
 Open the Unit V Study Guide, read the   unit lesson, and then work with        the embedded interactive model to decide what   biological and secondary        treatment equipment to include in your treatment   process design. 
 Continue from your Unit III Project and   make your fifth level one        heading titled “Biological and Secondary Treatment.”    Describe the secondary        treatment equipment that you engineered into your   treatment process. Be      sure   and describe the relevance and anticipated   reduction of related      analytical   concentrations within your industrial and   hazardous waste      treatment system   as they correspond with each technology that   you      selected. 

You are required to describe the equipment selection in at  least one page. 

Feedback to Learner 
You must review my feedback on these projects. You will need to use the interactive model, incorporate real data, and build upon previous units in order to be successful in this course project.

MAKE SURE YOU REAL STUDY GUIDE AND USE THE INTERACTIVE MODEL AND INCORPORATE REAL DATE IN THIS PAPER

  1. Question Attachments

    0 attachments —

Answer Detail

Get This Answer

Invite Tutor