Question 1.
Huron
Company produces a commercial cleaning compound known as Zoom. The direct
materials and direct labor standards for one unit of Zoom are given below: |
|
Standard
Quantity or Hours |
Standard
Price |
Standard
Cost |
||||
Direct
materials |
7.0 |
pounds |
$ |
3.00 |
per
pound |
$ |
21.00 |
Direct
labor |
0.4 |
hours |
$ |
14.00 |
per
hour |
$ |
5.60
|
|
During
the most recent month, the following activity was recorded: |
a. |
Thirteen
thousand six hundred pounds of material were purchased at a cost of $2.90 per
pound. |
b. |
The
company produced only 1,360 units, using 12,240 pounds of material. (The rest
of the material purchased remained in raw materials inventory.) |
c. |
Six
hundred and forty four hours of direct labor time were recorded at a total
labor cost of $7,728. |
Required: |
Compute the materials price and quantity variances for the month. (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i.e., zero variance). Do not round intermediate calculations.) |
Question 2.
SkyChefs,
Inc., prepares in-flight meals for a number of major airlines. One of the
company’s products is grilled salmon in dill sauce with baby new potatoes and
spring vegetables. During the most recent week, the company prepared 4,000 of
these meals using 750 direct labor-hours. The company paid these direct labor
workers a total of $6,000 for this work, or $8.00 per hour. |
According
to the standard cost card for this meal, it should require 0.20 direct
labor-hours at a cost of $7.00 per hour. |
Required: |
||||||||||||||||||||||
(1) According to the standards,
what direct labor cost should have been incurred to prepare 4,000 meals? How
much does this differ from the actual direct labor cost? (Round
labor-hours per meal and labor cost per hour to 2 decimal places.) (2 Break down the difference computed in (1) above into a labor rate variance and a labor efficiency variance. (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i.e., zero variance).) Question 3.
Question 4.
2. Break down the difference computed in (1)
above into a variable overhead rate variance and a variable overhead
efficiency variance. (Indicate the effect of each variance by
selecting "F" for favorable, "U" for unfavorable, and
"None" for no effect (i.e., zero variance).) Question 5. A direct materials quantity standard generally includes an allowance for waste. True False |