BUSI 411 Week 6 Exam | Project Management Assignment Help | Liberty University

  • BUSI 411 Week 6 Exam | Project Management Assignment Help | Liberty University 
  • Question 1

The typical difference between quality circles and continuous improvement teams is:

  • Question 2

Fixing a problem will often cost money; to minimize these costs it is best to find and fix the problem:

  • Question 3

To minimize quality risks, which of the following would be least likely to be outsourced to less-developed countries?

  • Question 4

ISO certification differs substantially from the Baldrige Award in that it:

  • Question 5

TQM stands for:

  • Question 6

_______ variation is a variation whose cause can be identified.

  • Question 7

The chair of the operations management department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are in control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results:
 

Instructor

Number of Failures

Prof. A

13

 

Prof. B

0

 

Prof. C

11

 

Prof. D

16

 



Using .95 control limits (5 percent risk of Type I error), which instructor(s), if any, should he conclude is (are) out of control?

  • Question 8

A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results:
 

Sample

Service Life (hours)

1

495

500

505

500

2

525

515

505

515

3

470

480

460

470



What is the sample mean service life for sample 2?

  • Question 9

The greater the volume of the process being targeted for inspection, the more attractive __________ inspection is.

  • Question 10

The specifications for a product are 6 mm ± 0.1 mm. The process is known to operate at a mean of 6.05 with a standard deviation of 0.01 mm. What is the Cpk for this process?

  • Question 11

The direct result of disaggregating the aggregate plan is the:

  • Question 12

Aggregate planning is capacity planning for:

  • Question 13

Which of the following is most closely associated with disaggregation?

  • Question 14

Which one of the following would not be considered a decision option for purposes of aggregate planning?

  • Question 15

In doing aggregate planning for a firm producing paint, the aggregate planners would most likely deal with:

  • Question 16

 

Which one of the following most closely describes net requirements for the current period?

  • Question 17

In a master schedule, the planning horizon is often separated into a series of time periods called:

  • Question 18

Which of the following is not usually necessary in order to have an effective MRP system?

  • Question 19

The MRP input stating which end items are to be produced, when they are needed, and what quantities are needed, is the:

  • Question 20

In MRP, the gross requirements of a given component part are calculated directly from:

  • Question 21

 

The degree to which a product or service satisfies its intended purpose is determined by service after delivery, ease of use, design, and conformance to design.

  • Question 22                                                                                                                                                                                                                                                                                                                                                                                        

Control limits are based on multiples of the process standard deviation.

  • Question 23

In the master production schedule, production is planned for the next period whenever the available-to-promise quantity becomes negative.

  • Question 24

Independent demand tends to be more "lumpy" than dependent demand, meaning that we need large quantities followed by periods of no demand.

  • Question 25

Lot-for-lot ordering in MRP minimizes holding costs for parts that are carried over to other periods.

 

Answer Detail