BUSI 411 Week 6 Exam | Project Management Assignment Help | Liberty University
- Liberty University / BUSI 411
- 08 Feb 2019
- Price: $13
- Other / Other
- BUSI 411 Week 6 Exam | Project Management Assignment Help | Liberty University
- Question 1
The typical difference between
quality circles and continuous improvement teams is: |
- Question 2
Fixing a problem will often cost
money; to minimize these costs it is best to find and fix the problem: |
- Question 3
To minimize quality risks, which
of the following would be least likely to be outsourced to less-developed
countries? |
- Question 4
ISO certification differs
substantially from the Baldrige Award in that it: |
- Question 5
TQM stands for: |
- Question 6
_______ variation is a variation
whose cause can be identified. |
- Question 7
The chair of the operations
management department at Quality University wants to construct a p-chart
for determining whether the four faculty teaching the basic P/OM course are
in control with regard to the number of students who fail the course.
Accordingly, he sampled 100 final grades from last year for each instructor,
with the following results:
|
- Question 8
A design engineer wants to
construct a sample mean chart for controlling the service life of a halogen
headlamp his company produces. He knows from numerous previous samples that
this service life is normally distributed with a mean of 500 hours and a
standard deviation of 20 hours. On three recent production batches, he tested
service life on random samples of four headlamps, with these results:
|
- Question 9
The greater the volume of the
process being targeted for inspection, the more attractive __________
inspection is. |
- Question 10
The specifications for a product
are 6 mm ± 0.1 mm. The process is known to operate at a mean of 6.05 with a
standard deviation of 0.01 mm. What is the Cpk for this
process? |
- Question 11
The direct result of
disaggregating the aggregate plan is the: |
- Question 12
Aggregate planning is capacity
planning for: |
- Question 13
Which of the following is most
closely associated with disaggregation? |
- Question 14
Which one of the following would
not be considered a decision option for purposes of aggregate planning? |
- Question 15
In doing aggregate planning for a
firm producing paint, the aggregate planners would most likely deal with: |
- Question 16
Which one of the following most
closely describes net requirements for the current period? |
- Question 17
In a master schedule, the planning
horizon is often separated into a series of time periods called: |
- Question 18
Which of the following is not
usually necessary in order to have an effective MRP system? |
- Question 19
The MRP input stating which end
items are to be produced, when they are needed, and what quantities are
needed, is the: |
- Question 20
In MRP, the gross requirements of
a given component part are calculated directly from: |
- Question 21
The degree to which a product or
service satisfies its intended purpose is determined by service after
delivery, ease of use, design, and conformance to design. |
- Question 22
Control limits are based on
multiples of the process standard deviation. |
- Question 23
In the master production schedule,
production is planned for the next period whenever the available-to-promise
quantity becomes negative. |
- Question 24
Independent demand tends to be
more "lumpy" than dependent demand, meaning that we need large
quantities followed by periods of no demand. |
- Question 25
Lot-for-lot
ordering in MRP minimizes holding costs for parts that are carried over to
other periods. |