- Question 1
Responses
to all identifiable risks should be a top priority for the project manager. |
- Question 2
When
considering risk value, the lower the value, the higher the level of risk. |
- Question 3
The
initial step in the risk management process is to |
- Question 4
Most
changes on a project are related to |
- Question 5
One
common mistake made early in the risk identification process is to |
- Question 6
Which of
the following is NOT one of the steps in the risk management process? |
- Question 7
The
attempt to recognize and manage potential and unforeseen trouble spots that
may occur when a project is implemented is known as |
- Question 8
Although
most risks are presented as something not desirable, there can also be
desirable risks called Opportunities. |
- Question 9
If a
project needs one earth mover six months from now in order to complete one
activity, and the organization has four such machines, there is no equipment
resource constraint. |
- Question 10
All of
the following are types of resource constraints EXCEPT |
- Question 11
Comparing
Planned Costs versus Actual Costs will give the project manager a quick
understanding of the status of the project. |
- Question 12
A
project budget report is showing our project as spending $35,000 against a
budgeted amount of $40,000. Which of the following is true? |
- Question 13
Resource
leveling or smoothing is only used on projects which are resource
constrained. |
- Question 14
Since
resource leveling or smoothing delays noncritical activities, a common result
is a decrease in network sensitivity. |
- Question 15
The fact
that you must pour foundation before you frame the house and that you have to
frame the house before you can put on the roof demonstrates scheduling constraints. |
- Question 16
A
special truck that George needs on his project has been scheduled on another
project. This is an example of what type of resource constraint? |
- Question 17
When
deciding which staff to team-up to work on work packages, factors to consider
are: |
- Question 18
When it
is necessary to reduce project duration and resources are constrained, which
of the following is NOT a reasonable option? |
- Question 19
As a
project is crashed and project duration is reduced, direct costs typically |
- Question 20
One way
of reducing project costs is identifying tasks that _________ can do
themselves. |
- Question 21
All of
the following are disadvantages of scheduling overtime EXCEPT |
- Question 22
The relationship
between the normal point and the crash point is assumed to be |
- Question 23
The
higher the cost slope of an activity the lower the cost to reduce its
duration. |
- Question 24
Sometimes
very high __________ costs are recognized before a project begins and
reducing these costs through shorter project durations becomes a high
priority. |
- Question 25
Because
direct costs are assumed to be developed from "normal" methods and
in a "normal" amount of time, any reduction in activity time should
add to the costs of the activity. |