  • Question 1

If a project criterion should be optimized if at all possible, it is classified as being constrained.

 

  • Question 2

Responsibility matrices are used primarily with small and medium-sized projects and have limited use in large projects.

 

  • Question 3

All of the following are ways the WBS helps in managing projects EXCEPT

 

  • Question 4

During the course of a project, it is possible that the project priorities may change.

 

  • Question 5

One of the primary jobs of a project manager is to manage the trade-offs associated with the project. Which of the following is NOT one of the basic classifications of project priorities?

 

  • Question 6

An expected output over the life of a project would be classified as a target.

 

  • Question 7

 

Linda has just been assigned manager of a project to develop a new advertising campaign for an established product. Her first step should be to

  • Question 8

Jose is looking at a document that outlines the specific deliverables and sub-deliverables required to complete the writing of a technical support manual. He is most likely viewing the

 

  • Question 9

The intersection of work packages and the organizational unit creates a project control point called a cost account.

 

  • Question 10

Which of the following is a good condition for bottom-up estimating?

 

  • Question 11

Which of the following methods is NOT considered a top-down approach to estimating project time and cost?

 

  • Question 12

Richard is collecting estimates for a house that he will have the funding to build in 12 months. Which of the following factors does Richard need to consider in regard to the quality of these estimates?

 

  • Question 13

An external view of a Mega Project based upon the outcome of similar projects undertaken in the past is known as:

 

  • Question 14

Reasons why estimating time and cost are important include all of the following EXCEPT

 

  • Question 15

If time and costs are important to a project the top-down approach to estimating time and costs for the project is the best choice.

 

  • Question 16

Estimates that are typically based on estimates of elements found in the work breakdown structure are called bottom-up estimates.

 

  • Question 17

Refining Estimates may be necessary for a number of reasons. For example, a manager getting further into a project and obtaining a better understanding of what needs to be done to accomplish a project and meet the needs of the customer is an example of

 

  • Question 18

The assumption that all immediate preceding activities must be 100% complete is too restrictive in some situations. When an activity is broken down into smaller segments in order to start the succeeding activity sooner, this is called

 

  • Question 19

Using free slack does not delay any following activities and requires no coordination with managers of other activities.

 

  • Question 20

The backward pass determines project duration.

 

  • Question 21

The minimum amount of time a dependent activity must be delayed to begin or end is referred to as

 

  • Question 22

When translated into a project network, a work package will become

  • Question 23

An activity that has more than one dependency arrow flowing into it is termed a(n)

  • Question 24

One piece of information that the arrows within the Activity-on-Node network can convey is

 

  • Question 25

The amount of delay within a task that will not delay the overall project is known as a

 