MNGT/520 MNGT520 MNGT 520 Advanced Production Management

MNGT 520 Advanced Production Management

Course Number and Name: MNGT 520 – Advanced Production Management

Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec’s production schedule calls for 5000 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs per unit are shown.

 

Component                             Manufacturing Cost                            Purchase Cost

Frame                                                  $38.00                                                 $51.00

Support                                               $11.50                                                 $15.00

Strap                                                    $ 6.50                                                  $ 7.50  

 

Three departments are involved in the production of these components. The time (in minutes per unit) required to process each component in each department and the available capacity (in hours) for the three departments are as follows:

 

Department

Component                             Cutting                        Milling             Shaping

Frame                                      3.5                               2.2                               3.1

Support                                   1.3                               1.7                               2.6

Strap                                        0.8                               —                                1.7

Capacity (hours)                      350                              420                              680

 

  1. Formulate and solve a linear programming model for this make-or-buy application.

How many of each component should be manufactured and how many should be purchased?

  1. Let FM      =  number of frames manufactured

                        FP        =  number of frames purchased

                        SM       =  number of supports manufactured

                        SP        =  number of supports purchased

                        TM       =  number of straps manufactured

                        TP        =  number of straps purchased

 

 

 

 

 

 

Min

38FM

+

51FP

+

11.5SM

+

15SP

+

6.5TM

+

7.5TP

 

 

s.t.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.5FM

 

 

+

1.3SM

 

 

+

0.8TM

 

 

£

21,000

 

2.2FM

 

 

+

1.7SM

 

 

 

 

 

 

£

25,200

 

3.1FM

 

 

+

2.6SM

 

 

+

1.7TM

 

 

£

40,800

 

FM

+

FP

 

 

 

 

 

 

 

 

³

5,000

 

 

 

 

 

SM

+

SP

 

 

 

 

³

10,000

 

 

 

 

 

 

 

 

 

TM

+

TP

³

5,000

FM, FP, SM, SP, TM, TP ³  0.

 

             Solution:

 

Manufacture

Purchase

Frames

5000

0

Supports

2692

7308

Straps

0

5000

Answer Detail