CPCCBC5018A Apply structural Principles Medium rise Construction

Assessment Task 2: Site establishment & temporary works.

Student Version: Report, Project, Portfolio

Student information

Student name:

Student ID:

Section A – Program/Course details

Qualification code:

CPC50210

Qualification title:

Diploma building construction

Unit code:

CPCCBC5018A

Unit title:

Apply structural Principles Medium rise Construction

Section B – Assessment task details

Assessment number:

2

Semester/Year:

201920

Assessment task results:

This assessment task will be marked as:

? Ungraded result: Satisfactory or Not Satisfactory

? Other (eg points):

Section C – Instructions to students

Task instructions:

  • Use technical report template provided in Bright-space with all technical data gathered from AS2601 and other referred documents to be referenced into completed Harvard style Bibliography.
  • Students to simulate coordination & management of site establishment planning from construction drawings provided. Site establishment plan must satisfy relevant OHS legislation, interpret and implement all onsite safety requirements for historical building programmed for external facelift and partial internal demolition works.  This assessment task covers 14 % of your overall marks for this unit.
  • This assessment must be uploaded to Bright-space as required – see weekly schedule for due date.
  • No sharing of images or internet downloads accepted

Section D – Conditions for assessment

Conditions:

Student to complete and attach Assessment Cover Sheet to the completed Assessment Task.

  • Each step should be on a separate page. Any images need a heading and the required notation. (no text = FAIL)
  • The report should have a front cover, contents page and references notated.
  • Establishment Plan to refer to the site address as shown on construction drawings provided.
  • This Assessment Task is to be presented in a professional report format as set out in the report template provided, uploaded onto Brightspace.
  • Upload completed CRS170/CRS174/176 whichever is applicable as separate document to Bright-space, THIS IS MANDATORY.
  • In a Word doc format (not in Pages Format) of the Assessment Task, dated with the unit code and title and Assessment Task number.
  • Pdf format of the report is also to be uploaded.
  • Definitely NO Zip files or WPS files.
  • File labelling convention yymmdd unit code Student name assessment task No.
  • Every task must be completed satisfactorily for competence to be achieved.
    *Competence must be achieved before grades are allocated.
  • Submitted work MUST achieve an acceptable Turn It in Score
  • It is the student’s responsibility to ensure submitted work returns an acceptable Turn It In score in line with Holmesglen’s plagiarism policy.

Equipment/resources students must access:

Equipment/resources to be provided by the RTO:

AS2601; Safe Work Australia Code of Practice for Demolition; NCC; Worksafe workplace amenities & work environment Sep 2008; NOHSC National COP for Noise management &hearing protection. Construction management plan guidelines City of Melbourne

Copy and paste here from Assessor version.


Section E – Marking Guide

Assessment number:

2

Assessment title:

Coordinate & manage site establishment and construction management plan

Student ID:

ID.

Student name:

Student name.

Unit code:

5018A

Unit title:

Apply Structural Principles to medium-rise constructions.

Date:

Criteria for assessment

Satisfactory

Comment

Yes

No

The following has been submitted for assessment:

Report format used for site establishment task

?

?

Click here to enter text.

Worksafe site establishment planning sheet used

?

?

Click here to enter text.

Marking criteria for each task process planned.

1.

Analyse and describe workplace amenities that will be required for this site?

?

?

Click here to enter text.

2.

Describe heath & hygiene requirements for 30 workers with 3 female onsite management personal.

?

?

Click here to enter text.

3.

Plan requirements for partial internal wall/ceiling demolition work.

?

?

Click here to enter text.

4.

Plan for heavy duty work platform to enable safe worker access for restoration of building external façade.

?

?

Click here to enter text.

5.

Describe measures required to protect adjoining public footpath to comply with legal requirements AS2601.

?

?

Click here to enter text.

6.

Consult City of Melbourne construction management guidelines and identify and analyse 6 CMP elements your establishment plan must comply with

?

?

Click here to enter text.

7.

Describe how you might protect adjoining buildings and trees shown on working drawings.

?

?

Click here to enter text.

8.

Provide details for an emergency evacuation plan.

?

?

Click here to enter text.

9.

What are medical requirements for planned work force?

?

?

Click here to enter text.

Section F – Feedback to Student

Has the student successfully completed this assessment task?

Yes

No

?

?

Additional Assessor comments (as appropriate):

Resubmission allowed:

Yes ?

No ?

Resubmission due date:

Assessor name:

Assessor name.

Assessor signature:

Date:

Answer Detail

Get This Answer

Invite Tutor