JAMSM Manufacturing Case Study

Case Study: JAMSM Manufacturing

You have been employed by a company called JAMS Manufacturing a company that manufactures widgets. Right now, the company was three manufacturing plants and an office building in three different locations (the office building is located next to one of the plants). Each manufacturing plant has a number of personal computers and manufacturing computers that are used in the buildings Currently, each computer connects to its own modem or router to connect to the Internet. The company has hired you to help them determine the best way to update their computer systems to network all the facilities.

The Transition

To complete this project, the company want sale their computers to be networked. Each manufacturing plant (and the office bustling) should have it sound plate network, and those networks should be connected to one another and to the Internet. There are approximately ten PCs in each manufacturing plant and 25 in the office building. These are allotted machines and the company expects to purchase all new computers, including additional servers for the networks.

In preparation for this project, tele communications wiring has already been put in place in the buildings, so you can consider that when you are working on your analysis.

Forth is assignment, you are to prepare a detailed report to help the company manage this transition. This report will need to Include all of the following:

An Executive Summary

This portion of the report Is often written last. It should bea o page summary of the entire report that includes an over view of the information contained in the report. Nothing should be mentioned here that is not include, din detail, in the body of the report.

Project Advantages and Changes

This section needs to describe the major benefits of this change. How will implementing this system help the manufacturing plant in general and specific employees in the company? Be sure to indicate changes that will be visible to employees and Include away to manage or mitigate those changes.

A Work Breakdown Structure

This portion of the document will outline at the individual tasks that need to be completed for the project to bea success This section should also indicate in What order the tasks will need to be completed. All steps