SEC6010 Wilmington University Sungrafix Company Preventative Controls Paper

Help me study for my class. I’m stuck and don’t understand. 


Create Preventative Controls for SunGrafix,
a video game design company. In some cases, the outage impacts
identified in the BIA may be mitigated or eliminated through preventive
measures that deter, detect, and/or reduce impacts to the system. Where
feasible and cost effective, preventive methods are preferable to
actions that may be necessary to recover the system after a disruption.
Preventative controls include the identification of effective
contingency planning preventive controls and maintaining these controls
on an ongoing basis. Identify and incorporate a variety of preventive
controls into your BCP. Some of the listed controls are the following: Appropriately sized uninterruptible power supplies (UPS) to provide short-term backup power to all system components (including environmental and safety controls);Gasoline- or diesel-powered generators to provide long-term backup power;Air-conditioning systems with adequate excess capacity to prevent failure of certain components, such as a compressor;Fire suppression systems;Fire and smoke detectors;Water sensors in the computer room ceiling and floor;Heat-resistant and waterproof containers for backup media and vital non electronic records;Emergency master system shutdown switch;Offsite storage of backup media, non-electronic records, and system documentation;Technical security controls, such as cryptographic key management; andFrequent scheduled backups including where the backups are stored (onsite or offsite) and how often they are recirculated and moved to storage.

Answer Detail

Get This Answer

Invite Tutor