MGT 455 WEEK 5 QUESTION S7.15

MGT 455 WEEK 5 QUESTION S  7  15
     A production process at Kenneth Day Manufacturing
is shown in Figure S7.9. The drilling operation occurs separately
from, and simultaneously with, the sawing and sanding operations.

A product needs to go through only one of the three assembly
operations (the operations are in parallel).
a) Which operation is the bottleneck?
b) What is the bottleneck time?
c) What is the throughput time of the overall system?
d) If the firm operates 8 hours per day, 20 days per month, what
is the monthly capacity of the manufacturing process?



 